# How to connect San José Open Data: building and planning permits (data.sanjoseca.gov) to Muse

> Connect San José Open Data: building and planning permits (data.sanjoseca.gov) to Muse with the Firecrawl MCP server.

To connect San José Open Data: building and planning permits (data.sanjoseca.gov) to Muse, add the Firecrawl MCP server to Muse, sign in on a Firecrawl team with Alexandria enabled, and ask for San José Open Data: building and planning permits (data.sanjoseca.gov) data in plain language. The connection works in your Muse chats, and you set it up once.

Muse uses San José Open Data: building and planning permits (data.sanjoseca.gov) as an MCP tool through Firecrawl's hosted MCP server, so you don't install or host a separate MCP server for San José Open Data: building and planning permits (data.sanjoseca.gov).

Muse is Meta's personal AI agent. It can set up MCP servers for itself, and the Firecrawl MCP server adds web search, scraping and every data provider in Firecrawl Alexandria.

## How do I connect San José Open Data: building and planning permits (data.sanjoseca.gov) to Muse?

### 1. Ask Muse to install Firecrawl

[Open a Muse chat](https://muse.ai/?prompt=Please%20install%20the%20Firecrawl%20MCP%20using%20https%3A%2F%2Fwww.firecrawl.dev%2Fagent-onboarding%2FSKILL.md) that asks it to install the Firecrawl MCP server by following Firecrawl's agent setup guide, then send the message.

[Set up in Muse](https://muse.ai/?prompt=Please%20install%20the%20Firecrawl%20MCP%20using%20https%3A%2F%2Fwww.firecrawl.dev%2Fagent-onboarding%2FSKILL.md)

### 2. Connect your Firecrawl account

Muse opens Firecrawl in your browser. Sign in, choose a team with Alexandria enabled, and approve access. No account yet? You can create one for free in the same flow.

### 3. Ask Muse for the data

Once Muse confirms Firecrawl is set up, ask in plain language and mention San José Open Data: building and planning permits (data.sanjoseca.gov) or Firecrawl Alexandria. For example:

```text
Use Firecrawl to answer this: What new construction did San José permit at 1123 Coleman Avenue, and what does the full permit record say?
```

## What can Muse do with San José Open Data: building and planning permits (data.sanjoseca.gov)?

City of San José building and land-use permits from San José Open Data (data.sanjoseca.gov), the city's CKAN portal, published by Planning, Building and Code Enforcement under Creative Commons CCZero and reloaded daily: Active Building Permits (including those under inspection), Expired Building Permits (back to 1938), the last 30 days of issued building permits, and planning permits issued in the last 30 and 60-180 days. Search building permits by address, ZIP, contractor, type, list, issue-date window, valuation or APN, newest or largest first; read one permit by folder number; rank contractors by permits and valuation for a window; and search planning permits (site development, conditional use, adjustments, tree removals) by address, applicant, type, file number or date. Every response and record carries the licence and a source URL. The lists carry no row update time, so new permits are polled with issued_since; finaled building permits older than 30 days are not published.

Muse can run any of San José Open Data: building and planning permits (data.sanjoseca.gov)'s 4 capabilities through Alexandria. Each call is billed in Firecrawl credits on your Firecrawl team.

- **Contractor activity**: Rank San José contractors of record by building permits issued in an issue-date window, or by total declared valuation, from one grouped query over the chosen lists (default: Active, Expired and Last 30 days, each permit once). Optional contractor substring, permit, occupancy or work type, ZIP and list. Each row has the company, permits, total valuation, net dwelling units, distinct parcels, first and last issue days, a source_url listing those permits, and the licence. Finaled permits older than 30 days are not published, so counts for past windows cover permits still active or expired. Costs 5 Firecrawl credits per call.
- **Get permit**: One City of San José building permit by folder number (2026-128769-CI), looked up in the Active, Expired and Last 30 days lists in one request: the shared permit fields with status (Active, Under Inspection, Expired, Finaled), contractor and applicant, source_url, licence, the list and dataset it came from, and raw, its datastore row with every published column except the owner's name (plan check approvals, internal folder id). A number in no list (unknown, a planning permit, or finaled more than 30 days ago) is not_found. Costs 5 Firecrawl credits per call.
- **Search permits**: Search City of San José building permits on San José Open Data (data.sanjoseca.gov, Planning, Building and Code Enforcement, CC0, reloaded daily) by street address, ZIP, contractor or applicant, permit, occupancy or work type, permit title, list (active, under inspection, expired, issued in the last 30 days), issue-date window, minimum valuation or Santa Clara County APN; newest issued first, or largest valuation first. Each record has the shared permit fields (folder number, type, occupancy, work type, title, status, issued and final days, address, ZIP, APN, valuation, net dwelling units, square feet, contractor and applicant), the list it came from, source_url and licence. The city publishes active, expired and last-30-days permits only: a permit finaled more than 30 days ago is in no list. An empty page is a valid result. Costs 5 Firecrawl credits per call.
- **Search planning permits**: Search City of San José planning (land-use) permits on San José Open Data: the Last 30 days and Last 60-180 days Planning Permits lists (Planning, Building and Code Enforcement, CC0, reloaded daily), about 700 permits: site development, planned development and conditional use permits, permit adjustments, sign permits, tree removals, zoning verification letters and environmental review. Filter by address, ZIP, APN, applicant, folder type, subtype or work, title, zoning, planning file number (H26-008), folder number, list and issue-date window; newest issued first. Each record has the shared permit fields plus file_number, zoning, period, the applicant, source_url and licence. The city publishes no list for permits issued 31 to 59 days ago, and nothing older than 180 days. An empty page is a valid result. Costs 5 Firecrawl credits per call.

## What should I ask Muse?

Name San José Open Data: building and planning permits (data.sanjoseca.gov) or Firecrawl Alexandria in the prompt so Muse reaches for it.

- [Use Firecrawl to answer this: What new construction did San José permit at 1123 Coleman Avenue, and what does the full permit record say?](https://muse.ai/?prompt=Use%20Firecrawl%20to%20answer%20this%3A%20What%20new%20construction%20did%20San%20Jos%C3%A9%20permit%20at%201123%20Coleman%20Avenue%2C%20and%20what%20does%20the%20full%20permit%20record%20say%3F)
- [Use Firecrawl to answer this: Which building permits has San José issued since October 20, 2026?](https://muse.ai/?prompt=Use%20Firecrawl%20to%20answer%20this%3A%20Which%20building%20permits%20has%20San%20Jos%C3%A9%20issued%20since%20October%2020%2C%202026%3F)
- [Use Firecrawl to answer this: Which contractors pulled the most building permits in San José in 2026?](https://muse.ai/?prompt=Use%20Firecrawl%20to%20answer%20this%3A%20Which%20contractors%20pulled%20the%20most%20building%20permits%20in%20San%20Jos%C3%A9%20in%202026%3F)
- [Use Firecrawl to answer this: What are the largest new-construction permits San José issued in 2026 and who is building them?](https://muse.ai/?prompt=Use%20Firecrawl%20to%20answer%20this%3A%20What%20are%20the%20largest%20new-construction%20permits%20San%20Jos%C3%A9%20issued%20in%202026%20and%20who%20is%20building%20them%3F)

### For agents

Start with the `data-sanjoseca-gov` provider. Use Firecrawl Alexandria first. With MCP, use firecrawl_search with sources: ["alexandria"] to discover relevant tools, firecrawl_find_tools to inspect the selected capability contracts, then firecrawl_scrape in alexandria mode to retrieve records. With the CLI, use firecrawl search alexandria, firecrawl list, then firecrawl scrape for the selected provider/capability. Follow the live tool schema and returned contract; never invent provider IDs or inputs. Ask for missing required details before execution, respect access and pricing, and inspect each result for errors. Cite retrieved records, distinguish missing data from failures, and explain gaps. If no suitable Alexandria capability exists, say so before using web sources. Do not treat a tool listing as retrieved data.

## Troubleshooting

### Why can't Muse find San José Open Data: building and planning permits (data.sanjoseca.gov)?

A keyless Firecrawl connection doesn't include Alexandria. Ask Muse to finish the Firecrawl sign-in, and choose a team with Alexandria enabled.

## Use San José Open Data: building and planning permits (data.sanjoseca.gov) in other AI apps

- [San José Open Data: building and planning permits (data.sanjoseca.gov) in ChatGPT](https://alexandria.firecrawl.dev/providers/data-sanjoseca-gov/connect/chatgpt)
- [San José Open Data: building and planning permits (data.sanjoseca.gov) in Claude](https://alexandria.firecrawl.dev/providers/data-sanjoseca-gov/connect/claude)
- [San José Open Data: building and planning permits (data.sanjoseca.gov) in Cursor](https://alexandria.firecrawl.dev/providers/data-sanjoseca-gov/connect/cursor)
- [San José Open Data: building and planning permits (data.sanjoseca.gov) in Grok Bot](https://alexandria.firecrawl.dev/providers/data-sanjoseca-gov/connect/grok-bot)

### Other data providers you can connect to Muse

- [How to connect Connecticut Solar and Battery Installs (data.ct.gov) to Muse](https://alexandria.firecrawl.dev/providers/data-ct-gov/connect/muse)
- [How to connect National Weather Service API (api.weather.gov) to Muse](https://alexandria.firecrawl.dev/providers/api-weather-gov/connect/muse)
- [How to connect ArcGIS public GIS layers to Muse](https://alexandria.firecrawl.dev/providers/arcgis-com/connect/muse)
- [How to connect Auction.com to Muse](https://alexandria.firecrawl.dev/providers/auction-com/connect/muse)

## Frequently asked questions

### What is Firecrawl?

Firecrawl is the web data API to search, scrape and interact with the web at scale. It turns websites into clean, LLM-ready data for AI agents and apps. The Firecrawl MCP server brings those tools into Muse, along with every data provider in Firecrawl Alexandria.

### What is Firecrawl Alexandria?

Firecrawl Alexandria is Firecrawl's library of 550+ data providers for AI agents, San José Open Data: building and planning permits (data.sanjoseca.gov) among them. Each provider returns structured data through documented capabilities. Muse finds the capability that fits your question and calls it through the Firecrawl MCP server, so you don't write any integration code. Alexandria needs a Firecrawl account signed in on a team with Alexandria enabled, or an API key from such a team; keyless connections don't include it.

### Is there a San José Open Data: building and planning permits (data.sanjoseca.gov) MCP server for Muse?

Muse reaches San José Open Data: building and planning permits (data.sanjoseca.gov) through Firecrawl's hosted MCP server, which serves San José Open Data: building and planning permits (data.sanjoseca.gov) and every other Alexandria provider as tools. Add the Firecrawl MCP server once and you don't install or host a separate MCP server for San José Open Data: building and planning permits (data.sanjoseca.gov).

### What does connecting San José Open Data: building and planning permits (data.sanjoseca.gov) to Muse unlock?

Muse can run all 4 of San José Open Data: building and planning permits (data.sanjoseca.gov)'s capabilities, including Contractor activity, Get permit and Search permits, from any chat, with structured results it can sort, compare and summarize. For example, ask: "Use Firecrawl to answer this: What new construction did San José permit at 1123 Coleman Avenue, and what does the full permit record say?" In the same conversation, Muse can combine San José Open Data: building and planning permits (data.sanjoseca.gov) with Firecrawl's web search and scraping and the other providers in Firecrawl Alexandria.

### Do I need my own San José Open Data: building and planning permits (data.sanjoseca.gov) account or API key to use it in Muse?

No. Muse calls San José Open Data: building and planning permits (data.sanjoseca.gov) through Firecrawl Alexandria and each call is billed in Firecrawl credits, so you don't need a separate San José Open Data: building and planning permits (data.sanjoseca.gov) account or API key.

### How much does it cost to use San José Open Data: building and planning permits (data.sanjoseca.gov) in Muse?

Each San José Open Data: building and planning permits (data.sanjoseca.gov) call costs 5 Firecrawl credits. The capability list on this page shows each price and its unit. The credits come from the Firecrawl team you connect to Muse, and finding the right capability is free.

### Can Muse use other providers besides San José Open Data: building and planning permits (data.sanjoseca.gov)?

Yes. The same Firecrawl MCP server reaches every provider in Firecrawl Alexandria, along with Firecrawl's web search and scraping, so you connect once.

### Can I use San José Open Data: building and planning permits (data.sanjoseca.gov) in other AI apps?

Yes. Connect Firecrawl to ChatGPT, Claude, Cursor, Grok Bot signed in on a Firecrawl team with Alexandria enabled, or use the Firecrawl MCP server, CLI or API with an API key from that team, and the same San José Open Data: building and planning permits (data.sanjoseca.gov) capabilities are available there. Keyless connections don't include Alexandria.
