Firecrawl Alexandria

Alberta Utilities Commission

Alberta Utilities Commission (auc.ab.ca) public regulatory record: the decisions, recent updates, notices, facility approvals, gas pipeline licence and monthly rate approval tables with eFiling document ids, the public PDF of any decision or notice with its extracted text, proceedings currently under review, featured (high-profile) applications, the hearing and events calendar, and the site's full-text search over decision PDFs and pages. Proceedings' party lists and exhibit indexes sit behind the eFiling login and are not covered.

2 Firecrawl tools use Alberta Utilities Commission

Try Alberta Utilities Commission now.

Choose an example or ask your own question.

Alberta Utilities Commission
TRY ASKING
1Request
string

The eFiling document id (e.g. 863220), as returned by `list_documents` and `search`.

number

Cap on the returned text; `text_truncated` reports when it applied.

string

Alternative to the id: a public document URL on prd-api-efiling20.auc.ab.ca (Anonymous/DownloadPublicDocumentAsync/{id}) or the legacy efiling-webapi.auc.ab.ca/Document/Get/{id} form.

5 credits
Codefollows the fields above
const result = await firecrawl.scrape({
  alexandria: {
    provider: "auc-ab-ca",
    capability: "regulatory-decision/get_document",
    options: {
      efiling_document_id: "863220",
      max_chars: 12000,
    },
  },
});
2Response example

This is a sample shape. Press Run to see live data from Alberta Utilities Commission.

Long values are shortened in this preview. The full response is 5 KB.

{
  "bytes": 195744,
  "content_type": "application/pdf",
  "document_number": "30958-D01-2026",
  "document_url": "https://prd-api-efiling20.auc.ab.ca/Anonymous/DownloadPublicDocumentAsync/863220",
  "efiling_document_id": "863220",
  "fetched": "live",
  "filename": "30958_X[]_Decision 30958-D01-2026 - Kneehill Energy Storage Facility Letter of Enquiry_000021.pdf",
  "observed_at_ms": 1791925192425,
  "proceeding_id": "30958",
  "text": "October 9, 2026 Decision 30958-D01-2026\n\nKneehill Solar GP Inc.\n2930, 155 Wellington Street West\nToronto, Ont. M5V 3H1\n\nAttention: Yasser Beshr\n\nKneehill Energy Storage Facility Letter of Enquiry\nProceeding 30958\nApplication 30958-A001\n\nApproval of minor amendments\n\n1. Kneehill Solar GP Inc., by Application 30958-A001, registered on July 21, 2026, applied\nto the Alberta Utilities Commission for approval to make minor amendments to the 10-megawatt\n(MW) energy storage facility within the existing Kneehill Solar Generation Facility boundary, in\nthe Three Hills area.\n\n2. The proposed work is related to facilities previously approved by the Commission but not\nyet constructed in Approval 30539-D02-2026.\n1\n\n3. Kneehill Solar requested to update the equipment of the battery energy storage system\nfrom the SolBank system to the HyperBlock system, a type of HyperStrong system.\nKneehill Solar indicated that the number of containers would be reduced from eight to five,\ninverters would be reduced from eight to three, and transformers would be reduced from four to\nthree. Kneehill Solar confirmed that the HyperBlock system uses the same lithium iron\nphosphate battery chemistry as the approved configuration and that the proposed changes are not\nchanging the battery technology or associated characteristics.\n2\n\n4. Kneehill Solar confirmed that the project capability remains the same as what was\napproved, at 10 MW/20 megawatt-hours.\n\n5. Kneehill Solar stated that the proposed HyperBlock system incorporates safety systems\nand design features that are comparable to the approved SolBank system and are intended to\nprevent, detect and mitigate thermal events, fire hazards and explosion risks. Kneehill Solar\nconfirmed that it will continue to meet the safety obligations in the approval, including energy\nstorage facility-related training, ongoing safety upgrades and annual updates to the site-specific\nemergency response plan.\n\n1\n Energy Storage Facility Approval 30539-D02-2026, Proceeding 305… [2,449 more characters]",
  "text_chars": 4449,
  "text_extraction": "ok",
  "text_truncated": false
}

Skills

Official skills using Alberta Utilities Commission

Alberta utility rate application intervention prepUse when a consumer advocate or regulatory analyst intervening at the Alberta Utilities Commission is preparing on a utility's rate application. Finds the open proceeding, its filings and the decision text of the last comparable case, the hearing calendar, and inflation to test the requested increase, then lists issues to raise.

For one utility's rate or tariff application. The proceeding id from step 1 carries into documents and events.

1. The proceeding

  1. Find the application with List current applications (applicant) or Search. Carry the proceeding_id.

  2. List its public documents with List documents (proceeding_id).

2. What was decided last time

  1. Find the utility's last comparable decision with Search and read it with Get document. Note approved return, disallowed costs and directions the utility had to follow.

3. Dates

  1. Read List events for the next three months to find the hearing and deadlines.

4. Is the ask reasonable

  1. Find Canada consumer price inflation with Series search and read it with Series observations for the test years. Compare it with the requested increase.

Write the intervention brief

  • Ask: what the utility requests, from its filings.

  • Last decision: directions and disallowances that should carry over.

  • Issues: requested increase versus inflation, unmet directions, cost items to test.

  • Dates: hearing and filing deadlines.

  • Sources: cite every figure to the capability and record it came from. Say what could not be found rather than guessing.

View skill
Alberta energy project regulatory trackerUse when a developer, investor, landowner or lender needs to know where an Alberta oil, gas, pipeline or power project sits with its regulators. Finds the AER applications and decisions, the AUC proceedings and hearing dates, and recent news, and builds one dated timeline with the next regulatory milestone.

For one company or project name. Application and proceeding numbers found early are reused to read each decision.

1. Energy regulator record

  1. Search Site search for the company and project. Collect application numbers.

  2. For each, read Get public notice and Get published decision: filing date, notice date, decision and date if decided.

2. Utilities commission record

  1. For power plants, transmission or gas utility matters, check List current applications (applicant the company) and List documents for decisions and notices. Read the latest decision text with Get document.

  2. List upcoming hearings with List events for the next 90 days and keep any tied to the proceeding.

3. Outside view

  1. Search Search articles for the project name to catch landowner, Indigenous or municipal opposition that often precedes a hearing.

Write the tracker

  • Timeline: every filing, notice, hearing and decision, dated, with its number and regulator.

  • Status: pending, approved with conditions, denied, or under review.

  • Next milestone: the next hearing or decision date and what it decides.

  • Risks: objections or conditions quoted from decisions or coverage.

  • Sources: cite every figure to the capability and record it came from. Say what could not be found rather than guessing.

View skill

Quality, speed and cost, last 24 hours, across every agent call to Alberta Utilities Commission through Alexandria.

Quality
100%
Calls answered without a tool error
Speed
6.2 s
95% of successful calls finish faster
Cost
5 credits
Firecrawl credits per call
Calls
22
Last 24 hours, every Alexandria user
Browse the library
//
Get started
//
Give your agent Alberta Utilities Commission.
One API key for the live web and every provider in Alexandria.
Are you an AI agent? See setup options