IEA
Public energy highlights, country metadata and observations; paid and account-gated non-CC datasets are refused.
3 Firecrawl tools use IEATry IEA now.
Choose an example or ask your own question.
const result = await firecrawl.scrape({
alexandria: {
provider: "iea-org",
capability: "energy/countries",
options: {
query: "France",
},
},
});This is a sample shape. Press Run to see live data from IEA.
{
"complete": true,
"count": 1,
"next_cursor": null,
"observed_at_ms": 1789442654254,
"records": [
{
"aliases": [
"FR",
"FRA",
"FRANCE",
"France"
],
"full_name": "France",
"iea_name": "France",
"is_aggregate": false,
"is_iea_member": true,
"is_oecd": true,
"iso2": "FR",
"iso3": "FRA",
"mes_name": "France",
"prices_code": "FRANCE",
"regions": [
"WEOEUR",
"OECDEUR",
"EU28",
"EU27_2020",
"G20",
"WORLD",
"OECDTOT",
"IEATOT",
"IEAFAMILY"
],
"source_url": "https://api.iea.org/countries",
"stats_code": "FRANCE"
}
],
"retrieved_at": "2026-09-15T03:24:14Z",
"schema_version": "1.0.0",
"source_updated_at": null,
"source_url": "https://api.iea.org/countries",
"vintage": null,
"warnings": []
}Firecrawl tools
3Ready-made Firecrawl tools that call IEA.
Skills
Official skills using IEA
Corporate PPA country screenUse when a corporate renewable energy procurement manager is choosing which countries to target for power purchase agreements. Reads each country's electricity generation mix and trend, industrial end-use electricity prices, EU non-household price detail where relevant and currency volatility against the reporting currency, then ranks markets.
For three to eight candidate countries. ISO3 codes from step 1 carry into every IEA read.
1. Grid mix
Resolve each country with
Countries.
Read monthly net production by source from dataset monthly-electricity-statistics with
Data for the last 24 months. Compute the share of wind and solar and its trend; a fossil-heavy grid makes a PPA's emissions impact larger.
2. What industry pays
Read dataset energy-prices-highlights with
Data for industrial electricity prices in USD.
For EU countries, find the non-household electricity price dataset with
Search datasets and read it with
Query data for the last four half-years.
3. Currency risk
Read
Rate history for each local currency against your reporting currency over the last year.
Write the country screen
Table: country, renewable share and trend, industrial price, EU detail, currency swing.
Shortlist: high price and high fossil share (most savings and impact) with tolerable currency risk.
Unknowns: PPA strike prices and market rules are not in these sources.
Sources: cite every figure to the capability and record it came from. Say what could not be found rather than guessing.
Country power transition benchmarkUse when an energy investor, policy analyst or corporate sustainability team needs to compare how fast countries are decarbonising their power. Pulls generation by fuel, CO2 by sector and electricity prices from the IEA, adds economic context from the World Bank, and ranks countries on transition speed with each figure sourced.
For three to ten countries. ISO3 codes resolved in step 1 key every later query.
1. Pick the right datasets
Resolve the countries with
Countries, then list free datasets with
Datasets (license cc_by). Keep the ids for electricity and heat, CO2 from fuel combustion and energy prices, and check each one's year range with
Dataset.
2. Generation and emissions
Pull ElecGenByFuel for the countries with
Dataset observations over the last ten years. Compute the share of wind, solar and hydro and how many points it moved.
Pull CO2BySector for the same years and keep the electricity and heat sector. Divide by generation for a rough intensity trend.
3. Price and economics
Pull household and industry electricity prices from the prices dataset with
Dataset observations.
Add GDP per capita and electricity access with
Indicator data so richer and poorer systems are not compared blindly.
Write the benchmark
Table: country, renewable share now and ten years ago, change in points, power-sector CO2 trend, household and industry price.
Ranking: fastest to slowest movers, adjusted for income band.
Notes: datasets with missing years or licence limits, named.
Sources: cite every figure to the capability and record it came from. Say what could not be found rather than guessing.
Drought hydro shortfall checkUse when a power trader, utility planner or industrial buyer in a hydro-heavy region (US Pacific Northwest, Brazil, Norway) worries that a dry season will cut hydro output and raise prices. Measures the precipitation and soil moisture deficit in the basin, reads recent hydro generation, and checks retail or national price data, returning a shortfall brief.
For one basin (given as a polygon or a few points) and the grid it feeds. The deficit measured in step 1 sets how hard to look at generation.
1. How dry
Pull monthly precipitation for the basin over the last three years with
Monthly history and compare with
Climate normals. Report the deficit as percent of normal for the wet season.
Read root-zone wetness for the same window with
Soil moisture. Dry soils absorb snowmelt and rain before it reaches reservoirs.
2. What hydro is doing
US basins: pull hydro generation for the states served with
Route data (electric power operational data, fuel hydro, monthly) and compare with the same months last year.
Outside the US: pull monthly electricity statistics for the country with
Dataset observations (dataset from
Datasets, product hydro).
3. Price consequence
US: pull retail price trend for the states on
electricity/retail-sales. Elsewhere: pull household and industry prices from the IEA prices dataset.
Write the shortfall brief
Deficit: precipitation and soil moisture versus normal, by month.
Generation: hydro output versus last year, in the source unit.
Price: direction and size of retail or national price change.
Outlook: what the next wet-season months must deliver to close the gap, stated qualitatively.
Sources: cite every figure to the capability and record it came from. Say what could not be found rather than guessing.
Benchmarks
Public records benchmarksQuality, speed and cost, last 24 hours, across every agent call to IEA through Alexandria.
- Quality
- 98%
- Calls answered without a tool error
- Speed
- 435 ms
- 95% of successful calls finish faster
- Cost
- 5 credits
- Firecrawl credits per call
- Calls
- 51
- Last 24 hours, every Alexandria user